Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.023 seconds
Massimino, R.J.; Williams, D.A.
Bettis Atomic Power Lab., West Mifflin, PA (USA)1983
Bettis Atomic Power Lab., West Mifflin, PA (USA)1983
AbstractAbstract
[en] This report summarizes the refueling operations performed to install a Light Water Breeder Reactor (LWBR) core into the existing pressurized water reactor vessel at the Shippingport Atomic Power Station. Detailed descriptions of the major installation operations (e.g., primary system preconditioning, fuel installation, pressure boundary seal welding) are included as appendices to this report; these operations are of technical interest to any reactor servicing operation, whether the reactor is a breeder or a conventional light water non-breeder core
Primary Subject
Secondary Subject
Source
May 1983; 200 p; Available from NTIS, PC A09/MF A01 as DE83013696
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue