Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.018 seconds
Kulcinski, G.L.; Emmert, G.A.; Maynard, C.W.
Wisconsin Univ., Madison (USA). Dept. of Nuclear Engineering1983
Wisconsin Univ., Madison (USA). Dept. of Nuclear Engineering1983
AbstractAbstract
[en] The work performed during the past fiscal year (1983) was directed almost entirely towards the MARS project. This tandem mirror reactor design study is due to be finished in September of 1983 and a final report will be issued at that time. The present report mainly covers progress made after the interim report and is meant to supplement information in UCRL-53333. The areas covered in this present report are: (1) blanket design improvements; (2) end cell neutronics; (3) RF heating systems; (4) economic optimization of blanket; (5) plasma startup; (6) Li17Pb83 corrosion; (7) double walled steam generator analysis; and (8) tritium system
Primary Subject
Source
19 Jun 1983; 31 p; Available from NTIS, PC A03/MF A01 as DE83016042
Record Type
Report
Literature Type
Progress Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue