Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.017 seconds
AbstractAbstract
[en] The initial estimate of the expected Cs-137 transport in Steel Creek following L Reactor restart as presented in the Environmental Assessment, was based on historical data. To improve these estimates of Cs-137 remobilization in the Steel Creek system, Cs-137 transport studies were made during the L-Reactor pumping tests of ambient water in February to April 1982. Based on data from measurements conducted during the L-Reactor pump tests of March 1982, the suspended sediment-water transport during the first year will be only 2.3 +- 1.8 Ci/y. Values for the other two components of the transport estimate (hot water desorption and biota loss) remain unchanged. The reassessmant will reduce the estimated ten year release from 41 to 14.4 Ci
Primary Subject
Source
12 Jan 1982; 12 p; Available from NTIS, PC A02/MF A01; 1 as DE84000639
Record Type
Report
Report Number
Country of publication
BETA DECAY RADIOISOTOPES, BETA-MINUS DECAY RADIOISOTOPES, CESIUM ISOTOPES, ENVIRONMENTAL TRANSPORT, HEAVY WATER MODERATED REACTORS, INTERMEDIATE MASS NUCLEI, ISOTOPES, MASS TRANSFER, MATERIALS, NUCLEI, ODD-EVEN NUCLEI, PRODUCTION REACTORS, RADIOACTIVE MATERIALS, RADIOACTIVE WASTES, RADIOISOTOPES, REACTORS, SPECIAL PRODUCTION REACTORS, SURFACE WATERS, WASTES, YEARS LIVING RADIOISOTOPES
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue