Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.025 seconds
AbstractAbstract
[en] The object of the general conceptual design study for a repository for disposal of radioactive waste in a granite formation is to ensure that the technology available in 1980 is suitable for the construction of such a repository. The recommended techniques and equipment are suitable for construction of a repository, located at a depth of 1000 metres in a granite batholith, with a capacity of 30,000 AVM canisters, cooled for 30 years on the surface, at a rate of 1,000 canisters per year. The structure consists of six access shafts of 4 and 5 metres diameter, drilled from the surface by the big-hole method, serving a network of 82 parallel galleries, 2,300 metres long, mined by conventional blasting. Shafts 100 metres deep are drilled in the floor of each gallery (74 shafts per gallery), each shaft accommodating five canisters. This represents an aggregate gallery length of 200 kilometres and an aggregate shaft length of 600 kilometres. The cost of the operation is 1.3% of the cost (ex-works) of the energy produced by the power stations generating the waste. Construction, operation and final abandonment will take 81 years. The sensitivity study of the design showed, by varying certain parameters, that location of the repository at a depth of 500 metres is not recommended and that the area covered by the repository of 4 km2 is halved if the canisters are first cooled for 100 years
Primary Subject
Source
1982; 656 p; ISBN 92-825-3217-8;
; CONTRACT 107-79-1 WASF

Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue