Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.019 seconds
AbstractAbstract
[en] The vitreous clay pipes that channel spilled water from the production reactor buildings (105-Bldg.) to the water confinement tanks (803 tank) and the earthen retention basins have damaged sections and repairs are in progress. Diversion paths are being considered to control the destination of water in the event a clay pipe should fail to carry water to the tank and basin. This memorandum discusses the relative risks to various diversion paths. 4 references, 5 figures, 8 tables
Primary Subject
Secondary Subject
Source
5 Jun 1981; 19 p; Available from NTIS, PC A02/MF A01 as DE84003685
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue