Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.012 seconds
Barks, D.B.; Gomer, F.E.; Kozinsky, E.J.; Moody, G.F.
Oak Ridge National Lab., TN (USA); General Physics Corp., Chattanooga, TN (USA); General Physics Corp., Dayton, OH (USA)1983
Oak Ridge National Lab., TN (USA); General Physics Corp., Chattanooga, TN (USA); General Physics Corp., Dayton, OH (USA)1983
AbstractAbstract
[en] This report presents the results of the second phase of a two-phase project undertaken to develop a more detailed understanding of the manner in which control room crews perform assigned tasks when mitigating plant malfunctions. Phase II had these objectives: (1) apply the task analysis (TA) methodology developed in Phase I for assessing pressurized water reactor (PWR) crews to create a data base for boiling water reactor (BWR) crews; (2) show how objective data collected during high-fidelity simulation runs can be used to augment TA data collected concurrently; (3) examine additional objective measures of operator performance; and (4) begin to apply the TA data to the development of predictive models of operator/system performance. Ten plant malfunctions were presented to two-man crews on a Boiling Water Reactor training simulator. Videotaped records of all simulation runs, written operating procedures, interviews, and talk-throughs were data sources for the entry of task analysis information into a computer-searchable data base
Primary Subject
Secondary Subject
Source
Sep 1983; 129 p; Available from NTIS, PC A07/MF A01; 1 - GPO as DE84000861
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue