Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.017 seconds
AbstractAbstract
[en] The project had to develop technical and economical concepts of utilization of low temperature heat and waste heat out of the Philippsburg nuclear power plant. Three general techniques turned out to be feasible and economical: - District heating for the eastern part of the town by extraction of 18 MW (thermal output) out of the low pressure part of the condensing turbine (total load of the district heating system is 37 MW), - Supply of greenhouses (total area of 20.000 m2 under glas) close to the plant by waste heat out of the condensing - turbine and generator-cooling-circuit (8 MW, 300C), - Supply of low-temperature waste heat out of the condensing circuit (4 MW, 200C) for fish-growing-basins. (orig.)
[de]
Die Untersuchung technisch-wirtschaftlicher Moeglichkeiten der Auskoppelung und Nutzung von Waerme aus Block II des Kernkraftwerkes Philippsburg fuehrt zu folgendem technisch realisierbarem und wirtschaftlich sinnvollem Gesamtkonzept: - Fernwaermeversorgung des Ostteils der Stadt Philippsburg bei Auskoppelung von 18 MW aus der Anzapfung A 4 der Turbine, - Versorgung eines Gewaechshauskomplexes von 2 ha unter Glas auf der Rheinschanzinsel mit Abwaerme aus den konventionellen Zwischenkuehlkreislaeufen (8 MW, rd. 300C), - Versorgung einer Fischzuschanlage mit Abwaerme aus dem Kondensatorkreislauf (4 MW, rd. 200C). (orig.)Original Title
Studie der Moeglichkeiten der Waermenutzung aus dem Kernkraftwerk Philippsburg
Primary Subject
Source
Dec 1983; 147 p; CONTRACT 03E4467A; With 21 refs., 31 tabs., 46 figs.
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue