[en] All LANL hardware requirements were met during the reporting period as scheduled. Lot 12 of T-111 alloy sheet and Lot 8 of yttrium platelets were procured to meet future WR production needs. The GEND IP schedule requirements for 49 fueled MC2893 heat sources were met. Pressure burst surveillance activities continued to be conducted in accordance with SNLA document BB328965. Final results of evaluations of two pressure-burst capsules were normal, suggesting that the corresponding heat sources should be in good condition. The hardware production period ended with an overall hardware process yield of 98.4%