[en] This report documents the technical evaluation of the monitoring of electric power to the reactor protection system (RPS) at the Browns Ferry Nuclear Plant, Unit 1. The evaluation is to determine if the proposed design modification will protect the RPS from abnormal voltage and frequency conditions which could be supplied from the power supplies and will meet certain requirements set forth by the Nuclear Regulatory Commission