Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.017 seconds
AbstractAbstract
[en] This report describes the drilling and testing of Harman No. 1 well, located in north-central Swisher county, about 7 miles north of Tulia, Texas. Drilling and testing were performed by Stone and Webster Engineering Corporation as a part of a nationwide program to identify potential locations for a nuclear waste repository. Stone and Webster worked under a contract with the US Department of Energy's Program Manager: Battelle Project Management Division, Office of Nuclear Waste Isolation. This report describes the drilling and testing activities actually performed (compared to the Field Test Plan), describes the problems encountered, and provides recommendations for future work. Data gathered during drilling and testing of the well are included as appendices to this report. Drilling of the well began July 29, 1982, and was completed September 7, 1982, when a cement plug was set between the depths of 1220 and 1400 feet. These data are preliminary. They have been neither analyzed nor evaluated. 5 figures, 4 tables
Primary Subject
Source
May 1984; 231 p; Available from NTIS, PC A11; 3 as DE84011891
Record Type
Report
Literature Type
Numerical Data
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue