Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.03 seconds
AbstractAbstract
[en] The Executive Director for Operations (EDO) in establishing the Piping Review Committee concurred in its overall scope that included an evaluation of the potential for pipe breaks. The Pipe Break Task Group has responded to this directive. This report summarizes a review of regulatory documents and contains the Task Group's recommendations for application of the leak-before-break (LBB) approach to the NRC licensing process. The LBB approach means the application of fracture mechanics technology to demonstrate that high energy fluid piping is very unlikely to experience double-ended ruptures or their equivalent as longitudinal or diagonal splits. The Task Group's reommendations and discussion are founded on current and ongoing NRC staff actions as presented in Section 3.0 of this report. Additional more detailed comments and discussion are presented in Section 5.0 and in Appendices A and B. The obvious issues are the reexamination of the large pipe break criteria and the implications of any changes in the criteria as they influence items such as jet loads and pipe whip. The issues have been considered and the Task Group makes the following recommendations
Primary Subject
Secondary Subject
Source
Nov 1984; 206 p; Available from NTIS, PC A10/MF A01 - GPO* $6.00 as TI85900518
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue