Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.016 seconds
Campbell, D.J.; Guthrie, V.H.; Flanagan, G.F.
JBF Associates, Knoxville, TN (USA); Oak Ridge National Lab., TN (USA)1985
JBF Associates, Knoxville, TN (USA); Oak Ridge National Lab., TN (USA)1985
AbstractAbstract
[en] Inspectors must make many decisions on the allocation of their efforts. To date, these decisions have been made based upon their own judgment and guidance from inspection procedures. The goal of this paper is to provide PRA information as an additional aid to inspectors. A structured approach for relating PRA information to specific inspection decisions has been developed. The use of PRA information as an aid in optimal decision making (1) in response to the current plant status and (2) in the scheduling of effort over an extended period of time is considered. 21 figs
Primary Subject
Source
1985; 15 p; 13. water reactor safety research information meeting; Gaithersburg, MD (USA); 22-25 Oct 1985; Available from NTIS, PC A02/MF A01 - GPO as TI86004784
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue