Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.017 seconds
AbstractAbstract
[en] There are about 10 000 valves in a PWR, which must have a high standard of reliability. This confidence can be obtained by a continuous effort at every important stage, in the maintenance of the product's quality: design, loop qualifying tests, manufacture, plant start-up tests, maintenance and periodic tests during operation, feed-back of experience. This paper describes more particularly the loop qualifying tests
Primary Subject
Source
Oct 1986; 5 p; International topical meeting on the operability of nuclear power systems in normal and adverse environments; Albuquerque, NM (USA); 29 Sep - 3 Oct 1986
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue