Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.015 seconds
AbstractAbstract
[en] In Hungary reliability analysis (RA) and probabilistic safety assessment (PSA) of nuclear power plants was initiated 3 years ago. First, computer codes for automatic fault tree analysis (CAT, PREP) and numerical evaluation (REMO, KITT1,2) were adapted. Two main case studies - detailed availability/reliability calculation of diesel sets and analysis of safety systems influencing event sequences induced by large LOCA - were performed. Input failure data were taken from publications, a need for failure and reliability data bank was revealed. Current and future activities involves: setup of national data bank for WWER-440 units; full-scope level-I PSA of PAKS NPP in Hungary; operational safety assessment of particular problems at PAKS NPP. In the present article the state of RA and PSA activities in Hungary, as well as the main objectives of ongoing work are described. A need for international cooperation (for unified data collection of WWER-440 units) and for IAEA support (within Interregional Program INT/9/063) is emphasized. (author)
Primary Subject
Source
International Atomic Energy Agency, Vienna (Austria); 217 p; Oct 1986; p. 137-148; Technical committee meeting on combining risk analysis and operating experience; Vienna (Austria); 25-29 Nov 1985; 5 refs, 4 figs, 1 tab.
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue