Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.018 seconds
Childress, S.; Brown, C.; Koizumi, G.; Malensek, A.; Morfin, J.G.; Murphy, T.; Stefanski, R.; Wehman, A.; Lu, B.
Fermi National Accelerator Lab., Batavia, IL (USA); Virginia Polytechnic Inst., Blacksburg (USA)1986
Fermi National Accelerator Lab., Batavia, IL (USA); Virginia Polytechnic Inst., Blacksburg (USA)1986
AbstractAbstract
[en] An extensive effort has been directed toward a major redesign of the Fermilab Direct Neutral Lepton Facility (DNLF). The goal has been a very significant cost reduction of the facility, with minimal sacrifice of physics potential. Hence the name ''Econodump'' applied to the redesign effort
Primary Subject
Source
Aug 1986; 42 p; Available from NTIS, PC A03/MF A01; 1 as DE87000089; Portions of this document are illegible in microfiche products. Original copy available until stock is exhausted.
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue