Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.016 seconds
AbstractAbstract
[en] Disassembly of irradiated fuel assemblies at the Fast Flux Test Facility (FFTF) Interim Examination and Maintenance (IEM) Cell involves removing fuel pins from the pin bundle by sliding the pins from parallel attachment rails after the outer fuel assembly duct has been removed. Special equipment has been developed for the remote removal of fuel pins that significantly reduces pin removal time and provides better control than the previous method of direct removal with a masterslave manipulator (MSM). Remote installation and adaptability to various fuel assembly configurations in the design of this equipment. 7 figs
Primary Subject
Source
Sep 1987; 10 p; American Nuclear Society winter meeting; Los Angeles, CA (USA); 15-19 Nov 1987; CONF-8711195--2; Available from NTIS, PC A02; 3 as DE88013586; Paper copy only, copy does not permit microfiche production.
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue