Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.035 seconds
AbstractAbstract
[en] The proposed action is the continuation of Facility Operating License DPR-23 to Carolina Power and Light Company for H.B. Robinson Unit 2. Unit 2, located adjacent to Lake Robinson in Darlington County, near Hartsville, South Carolina, employs a pressurized water reactor to produce up to 2200 megawatts thermal (MWt). A steam turbine-generator uses this heat to provide 700 megawatts electric (MWe) of net electrical power capacity. A design power level of 2300 MWt (730 MWe) has been requested and is considered in the assessments contained in this statement. The exhaust steam is cooled by a flow of water obtained from the discharged to a 2250-acre cooling lake, Lake Robinson. Land areas disturbed during construction of the plant, but not used, have been seeded to native grasses, trees, and shrubs. Construction of a cooling water discharge canal extension resulted in alteration of about 100 acres of wildlife habitat. Subsequently, the canal banks were seeded with pines and legumes. Some erosion has taken place in the pine-seeded areas. Some small fish are killed by impingement on the water intake screens. Organisms passing through the screens very likely do not survive their passage through the circulating water system. Operation of the plant will cause an increase in the temperature of Black Creek below Lake Robinson. A small impact exists due to production and, after processing, disposal or release of sanitary and chemical wastes. Unit 2 may discharge up to 500 pounds/day of chemicals (primarily sulfates). Under conditions of low flow into and out of the lake, this increases the sulfate concentration in the lake by less than 1 ppM over the normal 7.7 ppM
Primary Subject
Secondary Subject
Source
Apr 1975; 203 p; NTIS, PC A10 - US Govt. Printing Office. as TI88016202
Record Type
Report
Report Number
Country of publication
CONSTRUCTION, DOSE EQUIVALENTS, ENVIRONMENTAL EXPOSURE PATHWAY, ENVIRONMENTAL IMPACT STATEMENT, ENVIRONMENTAL IMPACTS, FORECASTING, LAW, LEGAL ASPECTS, LICENSING, LOCAL GOVERNMENT, MANAGEMENT, NUCLEAR POWER PLANTS, OCCUPATIONAL EXPOSURE, OPERATION, RADIATION HAZARDS, REGULATIONS, ROBINSON-2 REACTOR, SOUTH CAROLINA, STATE GOVERNMENT, US NATL ENVIRONMENT POLICY ACT
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue