Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.02 seconds
AbstractAbstract
[en] Two measurement series in the Paks Nuclear Power Plant, Hungary, are reported. One was accomplished in order to find out whether the very high temperature of the reactor was due to the erroneous positioning of the thermocouples. It was found out that the indication by the thermocouples of the fuel cassette was not a consequence of positioning. The second series of measurements was performed in order to test the noise diagnostics line in the Unit 3 and Unit 4 of the Paks NPP. (R.P.) 18 figs
Original Title
Detektorok es meroelancok muekoedoekepessegenek monitorozasa; used for reactor noise measurement at the Paks NPP
Primary Subject
Secondary Subject
Source
Nov 1988; 107 p
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue