Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.018 seconds
AbstractAbstract
[en] The Probabilistic Risk Assessment of the Hanford Site started about 3 years ago. The first facility studied was the N Reactor. A limited-scope Probabilistic Risk Assessment was completed in 1987 that showed the N Reactor met US Nuclear Regulatory Commission Probabilistic Risk Assessment goals and its risk to the public was comparable to the commercial industry. An N Reactor Level 3 Probabilistic Risk Assessment is under way and is scheduled for completion September 1989. The Level 1 phase is complete and results indicate a core damage frequency of 6.4 E-05/yr. A Fast Flux Test Facility Probabilistic Risk Assessment was started January 1989 and is due to be completed January 1992. Other major Probabilistic Risk Assessment activities are anticipated for the nonreactor facilities presently operating and planned at the Hanford Site. 5 refs., 4 figs
Primary Subject
Secondary Subject
Source
Dec 1988; 9 p; International topical meeting on probability, reliability and safety assessment; Pittsburgh, PA (USA); 2-7 Apr 1989; CONF-890405--23; Available from NTIS, PC A02/MF A01 - OSTI; 1 as DE89008793; Portions of this document are illegible in microfiche products.
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
ACCIDENTS, COMPUTER CODES, CONTROL SYSTEMS, COOLING SYSTEMS, ENRICHED URANIUM REACTORS, EPITHERMAL REACTORS, FAST REACTORS, GRAPHITE MODERATED REACTORS, LIQUID METAL COOLED REACTORS, LWGR TYPE REACTORS, NATIONAL ORGANIZATIONS, PLUTONIUM PRODUCTION REACTORS, POWER REACTORS, PRODUCTION REACTORS, REACTOR ACCIDENTS, REACTOR COMPONENTS, REACTORS, RESEARCH AND TEST REACTORS, RESEARCH REACTORS, SAFETY, SHUTDOWN, SODIUM COOLED REACTORS, TEST FACILITIES, TEST REACTORS, US DOE, US ORGANIZATIONS, WATER COOLED REACTORS
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue