Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.016 seconds
Cox, C.M.; Mahaffey, M.K.; Miller, W.C.
Westinghouse Hanford Co., Richland, WA (USA)1988
Westinghouse Hanford Co., Richland, WA (USA)1988
AbstractAbstract
[en] Preparatory activities are well under way at Hanford to convert the 309 Containment Building and its associated service wing to a 2.5 MWt nuclear test facility for the SP-100 Ground Engineering System (GES) test. Preliminary design is complete, encompassing facility modifications, a secondary heat transport system, a large vacuum system to enclose the high temperature reactor, a test assembly cell and handling system, control and data processing systems, and safety and auxiliary systems. The design makes extensive use of existing equipment to minimize technical risk and cost. Refurbishment of this equipment is 75% complete. The facility has been cleared of obstructing equipment from its earlier reactor test. Current activities are focusing on definitive design and preparation of the Preliminary Safety Analysis Report (PSAR) aimed at procurement and construction approvals and schedules to achieve reactor criticality by January 1992. 6 refs
Primary Subject
Secondary Subject
Source
Jan 1988; 17 p; 5. symposium on space nuclear power systems; Albuquerque, NM (USA); 11-14 Jan 1988; CONF-880122--22; Available from NTIS, PC A03/MF A01 - OSTI; 1 as DE89011044; Portions of this document are illegible in microfiche products.
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue