Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.019 seconds
Fernandes Filho, T.L.; Gibelli, S.M.O.
Comissao Nacional de Energia Nuclear, Rio de Janeiro, RJ (Brazil). Dept. de Reatores1988
Comissao Nacional de Energia Nuclear, Rio de Janeiro, RJ (Brazil). Dept. de Reatores1988
AbstractAbstract
[en] This study represents the Phase B of the Angra-1 Probabilistic Safety Study and is the the final report prepared for the IAEA under Research Contract No. 3423/R2/RB. The three main items covered in this report are the establishment of interim safety goals, analysis of Angra-1 operational experience and development of emergency procedures to address severe accidents. For establishment of interim safety goals a methodology for calculating consequences and risks associated to the Angra-1 operation was developed based on the available data and codes. The proposed safety goals refer to the individual risk of early fatality for people living in the vicinity of the plant, colective risk of cancer fatalities for people living near the plant, the propobability of core melt occurrence and the probability of dominant accident sequences. (author)
[pt]
Apresenta-se a fase B do estudo probabilistico de seguranca de Angra 1, feito para a IAEA sob o contrato de pesquisa n0 3423/R2/RB. Os tres itens principais cobertos nesse relatorio sao o estabelecimento de metas intermediarias de seguranca, analise da experiencia operacional de Angra 1 e desenvolvimento de procedimentos de emergencia para acidentes severos. (E.G.)Original Title
Estudo probabilistico de seguranca de Angra 1 - fase B
Primary Subject
Source
May 1988; 89 p
Record Type
Report
Report Number
Country of publication
LanguageLanguage
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue