Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.022 seconds
AbstractAbstract
[en] An in-depth evaluation was performed on non-safety-related control systems (see Section 1) that are typically used during normal plant operation on four nuclear steam supply system plants: a General Electric Company boiling-water reactor, a Westinghouse 3-loop pressurized-water reactor (PWR), a Babcock ampersand Wilcox Co. (B ampersand W) once-through steam generator PWR, and a Combustion Engineering PWR design. A study was also conducted to determine the generic applicability of the results to the class of plants represented by the specific plants analyzed. Generic conclusions were then developed. Steam generator and reactor vessel overfill events and reactor vessel overcooling events were identified as major classes of events having the potential to be more severe than previously analyzed. Specific substasks of this issue were to study these events to determine the need for preventive and/or mitigating design measures. This report describes the technical studies performed by the laboratories, the NRC staff assessment of the results, the generic applicability of the evaluations, and the technical findings resulting from these studies. This final report contains the staff's responses to, and resolution of, the public comments that were solicited and received before September 16,1988, in response to the draft reports issued for public comment on May 27, 1988. 39 refs, 1 fig., 7 tabs
Primary Subject
Secondary Subject
Source
Jun 1989; 57 p; Available from NTIS, PC A04/MF A01 - GPO - OSTI as TI89014849
Record Type
Report
Literature Type
Progress Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue