Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.016 seconds
AbstractAbstract
[en] During the time period from April 19, 1989--May 5, 1989, the Tritium Systems Test Assembly (TSTA) at Los Alamos National Laboratory (LANL) conducted its longest continuous integrated loop operation to date. This provided an opportunity to test some hitherto unproven capabilities of the TSTA Fuel Cleanup System (FCU). Previous FCU tests were reported. The purpose of the FCU is to remove impurities from a stream of hydrogen isotopes (Q2) representative of torus exhaust gas. During this run impurities loadings ranging from 60 to 179 sccm of 90% N2 and 10% CH4 were fed to the FCU. Each of the two FCU main flow molecular sieve beds (MSB's) were filled to breakthrough three times. The MSB's were regenerated during loop operations. 2 refs., 6 figs., 2 tabs
Primary Subject
Source
1989; 4 p; 13. international symposium on fusion engineering; Knoxville, TN (USA); 2-6 Oct 1989; CONF-891007--55; CONTRACT W-7405-ENG-36; Available from NTIS, PC A02/MF A01 as DE90002434; OSTI; INIS; US Govt. Printing Office Dep
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue