Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.015 seconds
AbstractAbstract
[en] A consolidated cost estimate for a superconducting 800 MeV extension of the LAMPF I linac is presented in this note. Based on recent CERN-LEP tender results for 20 superconducting cavities, the cost of a superconducting linac structure (402.5 MHz) can be projected with much better accuracy than so far. The total construction cost for an 800 MeV extension amounts to 99.5 M$, buildings, cryoplant etc. included. The corresponding figure for a normal conducting structure (1207.5 MHz, on axis coupled) is 104.6 M$
Primary Subject
Source
1989; 11 p; 15. European Hadron Facility workshop; Lecce (Italy); 9-14 Oct 1989; CONF-8910306--1; CONTRACT W-7405-ENG-36; NTIS, PC A03/MF A01 as DE90003167; OSTI; INIS; US Govt. Printing Office Dep
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue