Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.018 seconds
AbstractAbstract
[en] Operation of the AGS Complex, comprising a 200 MeV Linac, the 1.5 GeV Booster (400 MeV/amu heavy ions) which is under construction, and the AGS, requires service of multiple uses with different beam requirements. Local Linac users, Booster commissioning with protons and heavy ions, and the AGS physics program and accelerator studies must run concurrently in various combinations. A new timing system is being built which will distribute serially encoded events derived from real-time and magnetic field clocks to each accelerator. The master timing of the supercycle will be managed centrally with encoded reset events determining the assigned user for each pulse. Operational aspects of the design of this system will be described, along with the principal control system modifications necessary to implement this mode of operation. 4 refs., 3 figs
Primary Subject
Source
1989; 12 p; International conference on accelerator and large experimental physics control systems; Vancouver (Canada); 30 Oct - 3 Nov 1989; CONF-891094--9; CONTRACT AC02-76CH00016; NTIS, PC A03/MF A01 - OSTI as DE90003953; US Govt. Printing Office Dep
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue