Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.014 seconds
Haynes, D.L.; Jones, C.M.
Oak Ridge National Lab., TN (USA)1989
Oak Ridge National Lab., TN (USA)1989
AbstractAbstract
[en] In order to prevent loss of SF6 gas in the event of SF6leakage into the column vacuum system, the Holifield facility tandem accelerator is equipped with two all-metal pancake valves which serve as primary gas-containment valves. While these valves have never failed to function when required, there has been some concern that they might not close reliably with the high-velocity flow that could occur in the unlikely event of a large leak in the column vacuum system. Thus, it was decided to supplement these valves with auxiliary gas-containment valves which would reliably close, even with a high-velocity flow. This paper discusses the auxiliary valves system. 5 figs
Primary Subject
Source
1989; 7 p; SNEAP '89: symposium on northeastern accelerator personnel; Oak Ridge, TN (USA); 22-27 Oct 1989; CONTRACT AC05-84OR21400; NTIS, PC A02/MF A01 as DE90005448; OSTI; INIS; US Govt. Printing Office Dep
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue