Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.019 seconds
AbstractAbstract
[en] Basalt Waste Isolation Project (BWIP) borehole drilling and Exploratory Shaft Test Facility (ESTF) development involve minor localized impacts on the site hydrogeologic system. These impacts are in the form of voids created by the penetrations of the natural geologic site barriers and increases in the permeability of adjacent rock. Long-term impacts of borehole drilling and the ESTF can be minimized through carefully controlled siting, design specifications, construction techniques, and through the design of an effective borehole plugging system. 9 refs., 3 figs., 1 tab
Primary Subject
Source
24 Oct 1980; 16 p; CONTRACT AC06-77RL01030; OSTI as TI90005458; INIS
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue