Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.014 seconds
AbstractAbstract
[en] The DC-16 borehole cluster consists of three boreholes (DC-16A, -16B, and -16C). The purpose of the cluster is to evaluate the areal characterization of hydrologic parameters and to determine the homogeneity of the test horizons underlying the Reference Repository Location. Hydrologic tests that will be conducted include: step-drawdown, high-stress long-duration constant discharge pumping, vertical permeability, tracer, and slug injection/withdrawal tests. This test specification contains details for hydrologic testing of the DC-16 borehole cluster. It includes borehole specifications, description of tests, and a schedule for testing activities. 13 refs., 8 figs., 3 tabs
Primary Subject
Secondary Subject
Source
Mar 1983; 26 p; CONTRACT AC06-77RL01030; OSTI as TI90004816; INIS
Record Type
Report
Literature Type
Numerical Data
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue