Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.02 seconds
AbstractAbstract
[en] The Principal Borehole, RRL-2, was drilled to provide information required for shaft design, selection of porthole locations and site suitability studies. The borehole meets objective 1 of the Test Plan for Exploratory Shaft - Phase I and Phase II. The report represents the results of borehole drilling, the geological and geophysical logging, and the testing associated with Borehole RRL-2. 20 refs., 26 figs., 23 tabs
Primary Subject
Secondary Subject
Source
Jan 1984; 134 p; CONTRACT AC06-77RL01030; OSTI as TI90006204; INIS
Record Type
Report
Literature Type
Numerical Data
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue