Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.015 seconds
AbstractAbstract
[en] Generic Issue C-8 deals with staff concerns about public risk because of the incidence of leak test failures reported for main steam isolation valves (MSIVs) at boiling water reactors and the limitations of the leakage control systems (LCSs) for mitigating the consequences of leakage from these valves. If the MSIV leakage is greatly in excess of the allowable value in the technical specifications, the LCS would be unavailable because of design limitations. The issue was initiated in 1983 to assess (1) the causes of MSIV leakage failures, (2) the effectiveness of the LCS and alternative mitigation paths, and (3) the need for additional regulatory action to reduce public risk. This report presents the regulatory analysis for Generic Issue C-8 and concludes that no new regulatory requirements are warranted
Primary Subject
Secondary Subject
Source
Jun 1990; 22 p; NTIS, PC A03/MF A01 - GPO as TI90012677; OSTI; INIS
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue