Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.015 seconds
AbstractAbstract
[en] The forecast is based on the value of gross load at a winter peak time of a working day. It is expected that new 440 and 1000 MW nuclear power plants will be introduced by the year 2010. Power balance data for the individual areas in Czechoslovakia, and transmissions from abroad are listed. Briefly described is the condition of the transmission grid and its projected reconstruction by the year 2010. The balance of the Czechoslovak electric power grid will show liabilities between 1995 and 2000 (imports of 175 MW while it will show assets between 2005 and 2010 (exports of 275 MW). (M.D.). 5 tabs., 1 ref
Original Title
Prognoza rozvoje siti 400 a 220 kV elektrizacni soustavy CSFR
Primary Subject
Source
English translation available from Nuclear Information Center, 156 16 Prague 5-Zbraslav, Czechoslovakia, at US$ 10 per typewritten page.
Record Type
Journal Article
Journal
Zpravodaj VUPEK; CODEN ZVPKE; (no.2); p. 22-25
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue