Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.019 seconds
Pendzick, A.; Karl, F.; Mills, J.; Sullivan, J.
Proceedings of the first international workshop on accelerator alignment1990
Proceedings of the first international workshop on accelerator alignment1990
AbstractAbstract
[en] The g-2 ring is to be installed in the old 80 inch Bubble Chamber high bay. The ring is approximately 50 feet diameter, consists of 30 degree segments weighing 50 tons apiece and supported near their ends. Since the value of the muon magnetic moment depends heavily on knowing the effective field integral of the ring, a study was implemented to determine how the ring survey data varied with time and what factors may contribute to changes in the survey data
Primary Subject
Source
Stanford Linear Accelerator Center, Menlo Park, CA (United States); 322 p; Oct 1990; p. 4-24; 1. international workshop on accelerator alignment; Stanford, CA (United States); 31 Jul - 2 Aug 1989; CONF-8907190--; OSTI as DE91007297; NTIS; INIS
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue