Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.015 seconds
AbstractAbstract
[en] Several physical experiments in low-power commissioning stage for 5 MW THR are introdcued. These experiments include determination of the physical experiment power level of the low-power stage, absolute calibration of control rods, measurement of the isothermal-temperature reactivity coefficient. The methods of these experiments are introduced and the parameters are given
Primary Subject
Record Type
Journal Article
Literature Type
Numerical Data
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue