Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.024 seconds
AbstractAbstract
[en] The 1990 activity report of the Strasbourg Nuclear Research, concerning the Vivitron project, is presented. After having mounted all the Van de Graaff elements of the Vivitron needed for the generator tests, the tank was closed in July 1990. It was then put under vacuum, leaks were searched for and repaired. Voltage tests started in December and a voltage of 17.6 MV was reached in February. Modifications on the charging system and to improvement of the column protection against sparks are necessary before the voltage tests can be carried on. Great progress has been made in the setting up of the new Vivitron injector and analysing magnet. In this report are included the description of project different development steps, the Vivitron budget and the list of publications, congress contributions and internal reports. 18 figs
Original Title
Vivitron - Rapport d'activite 1990
Primary Subject
Source
1991; 57 p
Record Type
Report
Literature Type
Progress Report
Report Number
Country of publication
ACCELERATOR FACILITIES, BEAM CURRENTS, BEAM INJECTION, BEAM OPTICS, CHARGE DENSITY, CHARGED PARTICLE DETECTION, ELECTRIC GENERATORS, FISSION FRAGMENT DETECTION, GAMMA DETECTION, MAGNETIC ANALYZERS, MAGNETIC SPECTROMETERS, NEUTRON DETECTION, PERFORMANCE TESTING, PROGRESS REPORT, RADIATION DETECTORS, TANDEM ELECTROSTATIC ACCELERAT, VIVITRON TANDEM ACCELERATOR
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue