Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.015 seconds
AbstractAbstract
[en] A second model upgrading started in 1991 and will be completed by the end of 1992. In the simulator, the whole primary circuit system with its auxiliary systems is replaced. The most significant improvements are: a detailed 3D reactor model; thermohydraulics of the primary circuit; detailed containment and pressure suppression system models; a fuel element model, radioactivity transport in the primary circuit and in the containment. (Z.S.) 2 figs., 3 refs
Primary Subject
Source
European Nuclear Society (ENS), Bern (Switzerland); Czech Nuclear Society, Prague (Czech Republic); Slovak Nuclear Society, Bratislava (Slovakia); 245 p; Jan 1993; p. 31-34; ENS Topform '92: ENS East-West topical meeting on the safe and reliable operation of LWR NPPs; Prague (Czechoslovakia); 18-21 Oct 1992
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue