Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.019 seconds
Balbekov, V.I.; Malovitskij, A.Yu.
Gosudarstvennyj Komitet po Ispol'zovaniyu Atomnoj Ehnergii SSSR, Serpukhov (Russian Federation). Inst. Fiziki Vysokikh Ehnergij1991
Gosudarstvennyj Komitet po Ispol'zovaniyu Atomnoj Ehnergii SSSR, Serpukhov (Russian Federation). Inst. Fiziki Vysokikh Ehnergij1991
AbstractAbstract
[en] Bunch compression technique is considered which is supposed to be done before the beam transfer from the U-70 to be UNK. The latter is supposed to operate in the (0.4x3) TeV beam colliding mode. The technique includes the mismatching of the beam prior to its rotation in phase space around the stable fixed point. In addition to microwave instability two main problems are treated in detail - the nonlinearity of the synchrotron motion and the interaction of the beam with the RF cavities during the compression. Possible cures are investigated such as using an harmonic cavity at double of the RF frequency in order to linearise the main voltage. Also the suppression of the 1-st harmonic of the beam current is shown to be necessary for successful compression of the bunch. The influence of higher-order harmonic of the induced voltage is evaluated. 6 refs.; 9 figs.; 2 tabs
Original Title
Umen'shenie dliny sgustkov pered vyvodom iz U-70 dlya obespecheniya rezhima vstrechnykh puchkov v UNK
Primary Subject
Secondary Subject
Source
1991; 15 p
Record Type
Report
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue