Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.014 seconds
AbstractAbstract
[en] The paper presents the program of integration checks and factory acceptance tests the Primary Protection System underwent during the various manufacturing phases. It shows how built-in diagnostic tools were used to integrate the system into a functional unit. It then covers the system factory acceptance tests including heat rise and radio frequency interference testing. It outlines the factory acceptance test objectives, methods, acceptance criteria, tools and results. (Author)
Primary Subject
Secondary Subject
Source
Institution of Electrical Engineers, London (United Kingdom); British Nuclear Energy Society, London (United Kingdom); Institute of Energy, London (United Kingdom); Institution of Mechanical Engineers, London (United Kingdom); Convention of National Societies of Electrical Engineers of Western Europe (EUREL), London (United Kingdom); IEE Conference Publication Series; no.361; 272 p; ISBN 0 85296 550 8;
; 1992; p. 245-251; Institution of Electrical Engineers; London (United Kingdom); International conference on electrical and control aspects of the Sizewell B PWR; Cambridge (United Kingdom); 14-15 Sep 1992; ISSN 0537-9989; 


Record Type
Book
Literature Type
Conference
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue