Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.015 seconds
AbstractAbstract
[en] N G Bailey and Co. Ltd., UK were awarded the contract for the procurement, manufacture, works testing, works finishing, supply, delivery, off-loading, storage, installation, site finishing, preservation, setting to work and site testing of the following; the main cable installation throughout the Station including the addition of the Radioactive Waste Building, earthing and lightning protection installation, cable supporting steelwork and carriers and glanding and termination of cables. The cabling installation comprises power distribution, control and instrumentation cabling including all the associated cabling accessories, terminal boxes and similar components. The way that the contract was set-up, awarded and is now being carried out is described. Planning and industrial relations have been key features of the contract. (Author)
Primary Subject
Source
Institution of Electrical Engineers, London (United Kingdom); British Nuclear Energy Society, London (United Kingdom); Institute of Energy, London (United Kingdom); Institution of Mechanical Engineers, London (United Kingdom); Convention of National Societies of Electrical Engineers of Western Europe (EUREL), London (United Kingdom); IEE Conference Publication Series; no.361; 272 p; ISBN 0 85296 550 8;
; 1992; p. 80-85; Institution of Electrical Engineers; London (United Kingdom); International conference on electrical and control aspects of the Sizewell B PWR; Cambridge (United Kingdom); 14-15 Sep 1992; ISSN 0537-9989; 


Record Type
Book
Literature Type
Conference
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue