Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.02 seconds
AbstractAbstract
[en] Since 1979, EDF has been conducting intensive test campaigns on full-scale PWR simulators in order to study and improve the operators behaviour under incident as well as accident conditions. This paper presents some results obtained during tests carried out in 1986 on the P4 (1300 MWe power plant series) simulators of the Paluel Training Center. These results essentially concern the observed deviations, the diagnosis and the safety engineer's role. They are compared with the results of previous tests on 900 MWe unit simulators. The test organization and methodology, the result analysis methods and the biases introduced by this kind of test are also discussed. (author). 7 refs, 1 fig., 6 figs
Primary Subject
Secondary Subject
Source
Jan 1992; 8 p; Training course on management and analysis of severe accidents; Budapest (Hungary); 13-24 Jan 1992; Organised by France in the frame of the International Atomic Energy Agency, Technical Cooperation Program (Hun/9/013).
Record Type
Miscellaneous
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue