Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.02 seconds
AbstractAbstract
[en] In research Center for Nuclear Physics, Osaka University, the cyclotron cascade project of connecting the ring cyclotron of energy constant K = 400 as the booster to the existing AVF cyclotron was completed in the spring of 1991, and the adjustment of beam acceleration and test experiment were started in autumn. The vacuum system of this cyclotron was already reported in detail, acoordingly in this report, the present status is described. In the factory, the vacuum tank of 10 m diameter was not able to be assembled, therefore, vacuum test was carried out on the divided parts, and after connecting them at the site, the general test was performed. By the exhaust of nearly 10 h from the atmospheric pressure, the pressure of 2 x 10-5 Pa was attained. As for protons, the adjustment of acceleration up to 400 MeV was carried out. The construction and the function of the ring cyclotron are explained. As for the exhaust system, the shortening of the time for exhausting so that beam acceleration can be done was endeavored. The operation and monitoring of the cyclotron are explained. (K.I.)
Primary Subject
Source
Ishimaru, Hajime; Suetsugu, Yusuke (eds.); National Lab. for High Energy Physics, Tsukuba, Ibaraki (Japan); 464 p; May 1992; p. 64-68; 8. meeting on ultra high vacuum techniques for accelerator and storage rings; Tsukuba, Ibaraki (Japan); 12-13 Mar 1992
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue