[en] At the present, Peru has an installed electricity capacity of 4112 MW from which the 80% comes from hydroelectric sources and other 20% from thermal sources. Lima city concentrates the larger industrial activities and uses 95% of the hydro-electric supply the 5% comes from thermal origin. This situation provokes an energetic vulnerability to Lima, a city with more them 10 million of inhabitants, because climatic changes and the electric towers destruction. In the 1989-1992 period lack of energy meant economic losses for about US$ 2 100 000. To solve this problem the government is building a 300 MW thermal station. This alternative means a low investment for Kw installed but high production costs. Additionally the installation of the plant in Lima will increase the environmental contamination due to emission of about 20000 TM/year of SOx and 7500 TM/year of NOx. The research study recommends as a solution the diversification of energy sources, avoiding dependence of the hydro-electrical ones. In the same form it suggests that the next 300 MW power station to be installed for about 1998 would be a nuclear power plant but not thermal one. It also makes a revision of the new designs for nuclear power plants called safe inherently which design and construction philosophy avoid the possibility of accidents like Chernobyl. (author). 15 refs., 5 tabs., 13 figs
Original Title
Una central nucleoelectrica para la ciudad de Lima. Hasta que punto es una alternativa real?
Primary Subject
Secondary Subject
Source
Available from the Library of the Peruvian Institute of Nuclear Energy; Also issued in English.
Record Type
Journal Article
Journal
El Ingeniero Quimico; ISSN 1022-274X;