Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.019 seconds
AbstractAbstract
[en] The reactor primary coolant circuit is filled with water by natural circulation. The pressure in the hermetic compartment is increased to 0.12 MPa and successively reduced. This cycle is repeated until the humidity at reduced pressure decreases to below 70%. The cycle is discontinued and pressure is stabilized. The amount, temperature and pressure of the filling air as well as the pressure, temperature and relative air humidity in the hermetic compartment are then measured for 6 to 12 hours. The primary asset of this leak testing procedure is a shortening of the reactor unit shutdown period. (M.D.). 4 figs
Original Title
Zpusob opakovanych integralnich zkousek tesnosti hermetickych prostor bloku atomovych elektraren typu VVER-440 s lokalizacni vezi
Primary Subject
Source
30 Oct 1992; 20 Nov 1984; 12 p; CZ PATENT DOCUMENT 274411/B2/; CZ PATENT APPLICATION PV 8857-84.L; HU PRIORITY 4102/83; Application date: 20 Nov 1984
Record Type
Patent
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue