Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.054 seconds
Senichev, Yu.; Cutler, R.; Hurd, J.; Raparia, D.
Superconducting Super Collider Lab., Dallas, TX (United States). Funding organisation: USDOE, Washington, DC (United States)1993
Superconducting Super Collider Lab., Dallas, TX (United States). Funding organisation: USDOE, Washington, DC (United States)1993
AbstractAbstract
[en] The Superconducting Super Collider Accelerating Complex consists of a cascade of accelerators and each one of them accelerates the beam to some energy and then transfers it to the next stage. The design luminosity of 1033cm-2s-1 is obtained by the high efficiency of all stages and the ability to accelerate beam with as minimum emittance growth as possible. For this purpose the Linac pulse length is specified as 9 ps in order to minimize the number of target crossings and so to minimize the emittance growth during charge exchange injection into the LEB booster. However, the transient caused by switching on the beam makes up a significant part of the pulse length and can influence the characteristics of beam. In this paper we present the results of the transient study of the coupled cavity linac and discuss the model that predicts the parametric resonance between the beam and the field distortion setup during transient
Primary Subject
Secondary Subject
Source
May 1993; 4 p; International particle accelerator conference; Washington, DC (United States); 17-20 May 1993; CONF-930511--391; CONTRACT AC35-89ER40486; Available from OSTI as DE93019119; NTIS; INIS; US Govt. Printing Office Dep
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue