Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.023 seconds
Edwards, T.B.; Harris, S.P.; Reeve, C.P.
Westinghouse Savannah River Co., Aiken, SC (United States). Funding organisation: USDOE, Washington, DC (United States)1992
Westinghouse Savannah River Co., Aiken, SC (United States). Funding organisation: USDOE, Washington, DC (United States)1992
AbstractAbstract
[en] The uncertainty associated with the use of the K-Reactor axial power monitors (APMs) to measure roof-top-ratios is investigated in this report. Internal heating test data acquired under both DC-flow conditions and AC-flow conditions have been analyzed. These tests were conducted to simulate gamma heating at the lower power levels planned for reactor operation. The objective of this statistical analysis is to investigate the relationship between the observed and true roof-top-ratio (RTR) values and associated uncertainties at power levels within this lower operational range. Conditional on a given, known power level, a prediction interval for the true RTR value corresponding to a new, observed RTR is given. This is done for a range of power levels. Estimates of total system uncertainty are also determined by combining the analog-to-digital converter uncertainty with the results from the test data
Primary Subject
Secondary Subject
Source
May 1992; 90 p; CONTRACT AC09-89SR18035; Also available from OSTI as DE93014760; NTIS; US Govt. Printing Office Dep
Record Type
Report
Literature Type
Numerical Data
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue