Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.014 seconds
AbstractAbstract
[en] In 1991, at the Muehleberg nuclear power station a decision was made by the firm GIS to introduce an integrated management system (IBFS). The IBFS was selected from many systems on the basis of preliminary work by the company, Dornier. Dornier acted during the realisation stage as general contractor. figs
Original Title
Das betriebliche Arbeitsauftragsverfahren IBFS-BASY im Kernkraftwerk Muehleberg (KKM)
Primary Subject
Secondary Subject
Source
Schweizerische Vereinigung fuer Atomenergie, Bern (Switzerland); [240 p.]; 1993; p. C-1.1-C-1.34; Schweizerische Vereinigung fuer Atomenergie (SVA); Bern (Switzerland); SVA further education course: integrated plant management systems for nuclear power plants; SVA-Vertiefungskurs: Integrierte Betriebsfuehrungssysteme fuer Kernkraftwerke; Winterthur (Switzerland); 3-5 Nov 1993
Record Type
Book
Literature Type
Conference
Country of publication
Reference NumberReference Number
Related RecordRelated Record
INIS VolumeINIS Volume
INIS IssueINIS Issue