Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.045 seconds
AbstractAbstract
[en] Potential problems that could have arisen during the replacement of the steam generators at Electrabel's Doel 3 plant were anticipated and avoided by previewing the outage with a 3D CAD model combined with a scheduling package. An optimised working procedure was developed, saving time and money while reducing personnel radiation exposure. (Author)
Primary Subject
Record Type
Journal Article
Journal
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue