Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.015 seconds
AbstractAbstract
[en] The paper reviews the position of hydroelectric power schemes in the UK. It considers recently constructed and proposed schemes, rather than those built more than 30-40 years ago during the period when this source was being heavily developed. The planning regime for these newer schemes is explained, and the measures typically taken to ensure that projects achieve their environmental targets are outlined. It is concluded that hydropower may be developed satisfactorily according to all design criteria if normal safeguards are taken, and that the cost implications of these are usually acceptable. (Author)
Primary Subject
Record Type
Journal Article
Journal
IEE Proceedings-A. Science, Measurement and Technology; ISSN 0960-7641;
; CODEN IPATEI; v. 140(1); p. 20-23

Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue