Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.02 seconds
Blanton, P.S.; Eggers, A.G.; Opperman, E.K.; Jackson, R.J.
Westinghouse Savannah River Co., Aiken, SC (United States). Funding organisation: USDOE, Washington, DC (United States)1994
Westinghouse Savannah River Co., Aiken, SC (United States). Funding organisation: USDOE, Washington, DC (United States)1994
AbstractAbstract
[en] Transportation of radioactive material (RAM) in commerce beyond the boundaries of specific plant boundaries falls under the jurisdiction of the Department of Transportation (DOT). Regulations for movement of RAM are specified in the Code of Federal Regulations. Requirements for the design of and procedures for obtaining authorization to use specific packagings are contained in 49 CFR 173 and 10 CFR 71. These requirements and procedures do not apply to in plant or onsite moves of RAM which are not under DOT jurisdiction. This paper describes the present approach at the Savannah River Site (SRS) for evaluating, approving and conducting onsite transfers of RAM. Also the application of this process to a new SRS onsite package is described
Primary Subject
Secondary Subject
Source
1994; 11 p; Department of Energy defense programs packaging workshop; Knoxville, TN (United States); 16-19 May 1994; CONF-9405109--2; CONTRACT AC09-89SR18035; Also available from OSTI as DE94009543; NTIS; US Govt. Printing Office Dep
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue