Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.02 seconds
The current state of inservice testing programs at U.S. Nuclear Power Plants - a regulatory overview
Campbell, P.; Colaccino, J.
Proceedings of the Third NRC/ASME Symposium on Valve and Pump Testing. Session 1A--Session 2C: Volume 11994
Proceedings of the Third NRC/ASME Symposium on Valve and Pump Testing. Session 1A--Session 2C: Volume 11994
AbstractAbstract
[en] Information is provided on inservice testing (IST) of pumps and valves at U.S. nuclear power plants to provide consistency in the implementation of regulatory requirements and to enhance communications among utility licensees who may have, like NSSS vendors, similar kinds and numbers of components or comparable IST programs. Documents discussed include the ASME Operation and Maintenance Standards Parts 6 and 10 (covering inservice testing of pumps and valves in light water reactor power plants), the draft NUREG-1482, Guidelines for Inservice Testing at Nuclear Power Plants (including review comments by Nuclear Management and Resource Council), and applicable Licensee Event Reports including summaries of several reports relating to IST
Primary Subject
Secondary Subject
Source
Nuclear Regulatory Commission, Washington, DC (United States). Office of Nuclear Reactor Regulation; EG and G Idaho, Inc., Idaho Falls, ID (United States); 532 p; Jul 1994; p. 215-294; 3. ASME/NRC symposium on valve and pump testing; Washington, DC (United States); 18-21 Jul 1994; Also available from OSTI as TI94017136; NTIS; GPO
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue