Filters
Results 1 - 1 of 1
Results 1 - 1 of 1.
Search took: 0.017 seconds
AbstractAbstract
[en] A video profile monitor (VPM) system will be used in the AGS-to-RHIC (ATR) transfer line to acquire single bunches transferred at 30 Hz. An array of 12 video cameras will be connected to 4 frame grabbers through a wide-band flux. Fast VME image processing boards will analyze a 120 x 120 subset of the image, generated by a 4 x 4 convolution or an ROI computation and sent over the network during the AGS recycle time. Details of the design, results of lab tests and studies with ion and proton beams will be presented
Primary Subject
Secondary Subject
Source
1995; 4 p; Particle accelerator conference; Dallas, TX (United States); 1-5 May 1995; CONF-950512--6; CONTRACT AC02-76CH00016; Also available from OSTI as DE95010346; NTIS; US Govt. Printing Office Dep
Record Type
Report
Literature Type
Conference
Report Number
Country of publication
Reference NumberReference Number
INIS VolumeINIS Volume
INIS IssueINIS Issue